US-BASED · 24/7 OPERATIONS

From bare floor to link lights.

GPU cluster deployment.

SEC. 01 / THE WORK

The work is documented. It is not published.

Photographs of completed GPU and structured-cabling programs — and the scope, routes, timelines and certification records behind them — go out on request, under NDA, rather than onto a public page.

WHAT COMES BACK

  1. 01Scope & routesWhat was built, and how it was routed.
  2. 02TimelineMobilization to handover, row by row.
  3. 03Certification recordsPer link, with the re-test beside anything that failed the first time.
  4. 04PhotographsMatched to the build you are planning.

Tell us what you are building and we will send the programs that match it, at whatever level of detail your procurement needs.

Request photos & project details

SEC. 02 / COVERAGE

The work is North American. The record is worldwide.

52 PROGRAMS DELIVERED WORLDWIDE

SEC. 03 / THE INSTRUMENT

DATAHALL Our own software: one model of the hall that the floor, the schedule and the handover all read from.

SAMPLE HALL · DEMO DATA

Datahall floor plan: data hall cabinets, rows and aisles drawn to true scale.01

PLAN

The hall to true scale

Cabinets, rows and aisles at their real dimensions. The floor plan is the model, not a picture of one.

Datahall containment view: overhead cable trays routed above the rows with cable counts per span.02

CONTAINMENT

Trays before cable

Overhead runs drawn where they will be hung, with the cable count carried on every span.

Datahall takeoff view: fill and length calculated for a single trunk run.03RUN A · 96 TRUNKS · 13.8 M

TAKEOFF

Fill and length, per run

Every span knows what it carries and how far it goes — the cut list comes off the drawing, not a tape measure.

Datahall progress view on a phone: install, fiber pull, test and sign-off tracked rack by rack.04

PROGRESS

Rack by rack

Install, power fit, fiber pull, test, label, sign-off. Each cabinet carries its own checklist and its own history.

Datahall program board: build-out and pending approvals across every data hall.05

PROGRAM

Every hall on one board

Build-out per hall, approvals waiting on a signature, and what changed on the floor in the last hour.

Datahall handover export: the as-built record generated straight out of the model.06

HANDOVER

The record leaves with the hall

The as-built is generated out of the model — not compiled from photographs after the crew has gone.

The same hall in three dimensions.

SEC. 04 / THE BUILD

Ten steps, in the order they happen on site.

Pathways and trays go in around the racks; cooling and power follow once they stand. Every step ends with a record you keep.

We work out every route and measurement for tray and cable, then price the job from your design plans before you sign.

Crew plan · schedule · bill of materials

Takeoff · rev. CPre-contract

Racks48

Tray, ft1,240

Busway, ft460

Cooling hose, ft960

Trunks312

Quote ready

We set the pathways before the racks arrive, then hang and bond the cable trays above the rows once the frames stand.

Tray as-built · bonding test log

Trays & pathways · rows A–EBonded

Tray runs complete12 / 12

Tray hung, ft1,240

Bond, TGB → tray0.04 Ω

We check every delivery against the bill of materials and stage it according to the pull schedule. In our app the hall becomes an interactive map, so you can follow any cable's path from the dock to its port.

Interactive hall map · signed naming standard

Hall · rows A–EInteractive map

TRK-C07 → R-C07312 / 312 checked

We mark each rack's spot on the floor and level each frame on its mark before servers go in. Fixing a frame later means pulling everything back out.

Positions marked · frames leveled · servers mounted

Rack R-C07Position marked

Frame level0.4 mm/m

Switch U42 · screws torqued2 / 2

We connect each rack to the cleaned cooling loop, remove trapped air and check every joint for leaks. That happens with the rack still open, before any cable or power goes in.

Rack connect log · leak sensors tested · coolant sample

Loop connect · rack R-C07Before power

Purged · 30 min hold, no leaksPass

Busway hangs over the rows, each rack gets its tap-off, and every run is tested before it goes live.

Insulation test per run · torque log · tap-off map

Busway BW-C · feed ATap-off R-C07

Insulation 2.1 GΩ · torquedLive

We cut every cable to a length planned from the port map. Then we comb, strap and support each run at its rated bend radius.

Pulled to planned length · logged by rack and row

Rack R-C07 · frontDressed

Strapped · bend radius held30 mm

We log each connection on the port map as we patch it, so the records match the finished hall.

Port-to-port map · both ends labeled

Patch panel PP-C07 · 12PMap updated live

TRK-C07 → B0712 / 12 linked

We test every copper link and every fiber in each trunk. The results go to you exactly as the instrument recorded them.

Per-link record · Fluke Networks / EXFO

Link #041 · Cat6ACertification

Length43.8 m

Wire map8 / 8

NEXT margin+8.4 dB

Rated for10G

Pass

We close out each row as it's completed. Your handover pack is built from the live record while the crew is still on site.

DCIM-ready pack · test records · second-lead QC sign-off

Handover packBuilt from the live record

Row ARow BRow CRow DRow E

  • Port-to-port map
  • Test records · links, busway, loop
  • QC sign-off · second lead
  • DCIM-ready export

Then it boots.